Operator Information

Permitting Summary

Search for Permits Here

Permitting Process

When an operator wants to drill a well in Utah, they need to submit an application to drill a permit (APD). A complete review process ensures the environment and residents are protected while allowing responsible development of oil and gas resources. For additional information concerning the submittal of APDs, please read this guidance document.

E-Permit

This program allows oil and gas operators to electronically submit:
- APDs
- Sundry Notices
- Well Completion Reports
- Workover Tax Credit applications
- Well Logs

To request a new account, complete the Utah ePermit Registration Form in the Operator Forms section and submit the notarized form to the department.

Technical Review

The technical review evaluates a proposed drilling project's relevant local and regional information and identifies potential impacts. The review includes geologic assessment, water protection, cultural resources, soil assessment, regional precipitation, existing infrastructure, potential impacts to wildlife and habitat, previous area development, local/county ordinances, and spacing requirements. The division’s petroleum engineer reviews the APD for well construction and safety standards consistent with industry and division rules.

Bonding

Bonding is financial insurance an operator provides to the Division of Oil, Gas, and Mining for plugging and/or reclamation purposes. Division staff calculates and verifies adequate bonding to ensure the state is protected by providing sufficient monies for reclamation if wells are abandoned. The Division will release a bond once the well is plugged and all reclamation work has been completed.

All forms related to bonding can be found under the Operator Forms section of this website.

Pre-Site Evaluation

The pre-site evaluation allows division staff and interested parties to visit proposed sites to discuss issues requiring coordination, including risks to domestic or municipal water wells, surface waters, soil permeability, and natural drainages that could transport spilled fluids. Mitigation techniques such as rerouting drainages, constructing containment berms, or requiring specific drilling methods may be stipulated. In addition, the pre-drilling land characteristics of the site are noted, which helps in site reclamation.

Final Review and Approval

After all of the steps are completed, the permit manager completes a final review, and if requirements are in order, the permit is approved.