UNDERGROUND INJECTION CONTROL(UIC) GUIDANCE
UIC Class II Permitting Manual
This document is intended for use by oil and gas operators or others in preparing an application for a Class II injection well.
Step-Rate Test (SRT) Guidance
This document is intended to aide in conducting a Step-Rate Test.
Step-Rate Form
The mandatory reporting form for calculating and submitting Maximum Allowable Injection Pressure (MAIP) for both surface and downhole conditions
Standard Annulus Pressure Test Guidance
(Mechanical Integrity Test)
This document is intended for use while preparing for, and conducting a Standard Annulus Pressure Test.