UNDERGROUND INJECTION CONTROL(UIC) GUIDANCE

UIC Class II Permitting Manual

This document is intended for use by oil and gas operators or others in preparing an application for a Class II injection well.

Step-Rate Test (SRT) Guidance

This document is intended to aide in conducting a Step-Rate Test.

Step-Rate Form

The mandatory reporting form for calculating and submitting Maximum Allowable Injection Pressure (MAIP) for both surface and downhole conditions.

Standard Annulus Pressure Test Guidance
(Mechanical Integrity Test)

This document is intended for use while preparing for, and conducting a Standard Annulus Pressure Test.

Need help?

Richard Powell
UIC Manager
435-790-6145

John South
UIC Lead
385-835-1739