Examples of Required Bid Submittals

The following examples of bid submittals are being provided  to assist contractors when they are preparing their bid proposals. 

These required bid submittals must be included in the contractors bid proposal package that is delivered to the purchasing agent with the State of Utah Division of Purchasing

 

Section 0230: Access Improvements

1.02    SUBMITTALS

 

The CONTRACTOR shall submit with the Bid Proposal a description of access improvements to be performed at each site and shall not deviate from this plan without the written approval of the OWNER.  For sites not easily accessible, the CONTRACTOR may choose to gain equipment access, do hand work, or access with a helicopter.

 

Access will be on designated roadways identified in the construction documents and on the maps.  Small boulders and debris may need to be moved from the access routs.  Excessively rough areas of the road will be leveled out.  No culverts are needed.

 

 

Section 0240: Demolition and Clean-Up

1.02    SUBMITTALS

 

A.  CONTRACTOR shall submit with the Bid Proposal demolition and removal procedures and schedule for approval.  This should indicate if blasting is to be used in structure demolition.

 

No blasting will be used for demolition.  Structures will be demolished using a track hoe and D9 Cat.  Demolished materials will be transported to a licensed landfill.

 

 

Section 0250: Mine Closures

1.02    SUBMITTALS

 

CONTRACTOR shall submit with the Bid Proposal a list of equipment to be used to complete this section of the WORK.

 

Typical mason tools will be used for walls.  A portable welder and generator will be used for bat gates and shaft grates.  Trackhoe excavator will be used for backfilling shafts and adits.

 

B.  CONTRACTOR shall submit with the Bid Proposal the proposed construction procedures in writing.

 

Two hand crews will begin on hand backfills, bat gates and block walls.  Trackhoe excavator will prepare/improve access route.  When access routes are complete trackhoe will begin structure demolition.  After demo trackhoe will begin machine backfills.

 

 

Section 0251: Cast-In-Place Concrete

1.02    SUBMITTALS

 

A.        Concrete

 

CONTRACTOR shall submit with the Bid Proposal laboratory reports indicating that the supplier's concrete ingredients meet requirements specified.

 

Obtain from concrete supplier.

 

 

Section 0254: Polyurethane Foam (PUF) Mine Closures

1.02    SUBMITTALS

 

CONTRACTOR shall submit with the Bid Proposal the proposed construction procedures, including a description of the form materials to be used and the foam application equipment or method.

 

Forms will be constructed and placed in openings as directed by owner.  Foam will be prepared in buckets and poured into place.  No application equipment will be used.  Form materials will include chicken wire, cardboard, plastic sheeting and paper.

 

 

Section 0270: Site Grading/Earthwork

1.02    SUBMITTALS

 

A.  CONTRACTOR shall submit with the Bid Proposal a list of equipment to be used to complete this section of the WORK.

 

One D9 Cat, and 399 Track hoe excavator with a 5 cyd bucket.

 

B.  CONTRACTOR shall submit with the Bid Proposal locations of borrow areas for fill and topsoil for the approval of the OWNER when such areas are not shown on the Drawings.

 

Areas for borrow and topsoil will be those identified in the construction specifications.  No other borrow areas will be needed.

 

Section 0275: Material Transport

1.02    SUBMITTALS

 

A.        The CONTRACTOR shall submit with the Bid Proposal a list of equipment to be used to complete this section of the WORK.

 

Two Volvo dump trucks with pups will be used to haul materials.

 

Section 0280: Drainage Control & Stream Protection

1.02    SUBMITTALS

 

CONTRACTOR shall submit with the Bid Proposal the schedule and plan for implementing drainage control measures and for utilizing riprap, gabion mattress, or a combination of systems in accordance with these Specifications and Drawings.  If a combination of systems is planned, specific locations for each item shall be identified.  Also included shall be specifications of riprap or gabion mattress fill material if supplied as import, and specifications for gabion mattress to be used.

 

Riprap will be obtained from borrow area identified in the specifications and stockpiled next to the stream channel.  No gabion mattresses will be used.  Silt fence will be installed prior to any earthwork.

 

B.        The CONTRACTOR shall submit with the Bid Proposal a description of and location of stream protection measures to be used at each site.

 

Three hundred yards of silt fence will be placed as stream protection.  Straw bales will be placed in existing drainage ways.

 

C.        CONTRACTOR shall submit with the Bid Proposal the location of borrow areas intended for riprap unless otherwise specified in Section 0300:  Specific Site Requirements, or the Drawings.

 

All riprap will be obtained from locations identified in the construction specifications.

 

D.        CONTRACTOR shall submit with the Bid Proposal the specifications for materials and installation if either culverts or bridges are proposed for use.

 

Areas needing culverts will be excavated and prepared with gravel bedding, culverts will be placed and backfilled evenly.

 

 

Section 0285: Steam Bank Rehabilitation

1.02    SUBMITTALS

 

A.        CONTRACTOR shall submit with the Bid Proposal the location of sources of rock material for rock streambarbs and vortex rock weirs unless otherwise specified in Section 0300:  Specific Site Requirements, or the Drawings.

 

Rock material will be provided from the borrow locations identified in the specifications.  Other locations will be approved prior to collection.

 

B.        CONTRACTOR shall submit with the Bid Proposal the location of sources of live or dead plant materials intended for revetments and streambarbs unless otherwise specified in Section 0300:  Specific Site Requirements, or the Drawings.

 

Materials for revetments will be secured with the necessary permit from adjacent BLM lands.

 

 

Section 0290: Revegetation

1.02    SUBMITTALS

 

CONTRACTOR shall submit with the Bid Proposal the names of one seed supplier, and alternate, to be used for the seed mixtures required by these specifications.

 

Granite Seed, Lehi, Utah and Bitterroot Nursery, Montana

 

B.        CONTRACTOR shall submit with the Bid Proposal a written description indicating equipment to be used to perform the work required in this section.

 

Seeding will be done by hand broadcasting or seeding will be done using whirlygig spreaders

 

 

Section 0295: Barbed Wire Fencing

1.02    SUBMITTALS

 

A.        CONTRACTOR shall submit with the Bid Proposal the names of one or more suppliers to be used for fencing required by these specifications.

 

A-one Fencing Supplies, Preston, Idaho

 

B.        CONTRACTOR shall submit with the Bid Proposal a written description indicating equipment to be used to perform the work required in this section.

 

A 4-wheeler with a back mounted 4” auger drill will be used to establish post holes.  Standard fencing tools will be used to stretch and attach wire to posts.

 