Bids
must be submitted to the Division of Purchasing prior to the bid opening
date and time.
Do
not submit bid proposals to the Division of Oil, Gas & Mining.
Bids
submitted without the required documentation and/or submittals will be
disqualified.
Late
submission of bid proposals will not be accepted.
Within
each project's reclamation construction specification package is:
Project
Summary and Information to Bidders
Bidding Check
List
Instructions
to Bidders
Bid
Proposal
Each of
these sections will be explained below. The
reclamation construction specification package contains the necessary
information to prepare a responsible bid proposal. This page
summarizes and reiterates much of this same information and provides a
description and/or samples of the type of information being requested in the bid
proposal and required submittals.